Carpet for the bedroom arrives at last.
     | 
    
      
      New carpet is installed and an armoire and chest from Armand.
     | 
    
      
      
     | 
   
   
    
      
      Bathtub leaked (through the kitchen ceiling).  Luckily, no damage to the cabinets.
     | 
    
      
      
     | 
    
      
      
     | 
   
   
    
      
      The pantry (under the stairs) is cool. Pegboard on the sides.
     | 
    
      
      We put down the first boards in the music room.  The underlayment is .25" neoprene for sound dampening. 5 days to finish before the pianos arrive.
     | 
    
      
      
     | 
   
   
    
      
      The boards are taped together while the glue dries.
     | 
    
      
      
     | 
    
      
      
     | 
   
   
    
      
      
     | 
    
      
      The day before the furniture arrives. The floors are finished except for transition pieces.
     | 
    
      
      
     | 
   
   
    
      
      
     | 
    
      
      
     | 
    
      
      
     | 
   
   
    
      
      
     | 
    
      
      We finished the last floor (music room) the evening before the furniture arrived. 
     | 
    
      
      The music room rug.
     | 
   
   
    
      
      First transition piece (Brazilian cherry)
     | 
    
      
      Details of the t-moulding
     | 
    
      
      
     |