We take over - 07/30/06


The completion of the house is now in our hands. We setup camp at the new house on 5/14 with an air mattress and a dining table, and a functional kitchen and bathroom. The months of June and July were about installing the downstairs flooring.

Click on an image to view individually


DSCN0126.JPG
5/14/06. We setup camp and have slept here since.
DSCN0128.JPG
Our first nights were in the ping-pong room.
DSCN0131.JPG
Moving (first things first).
DSCN0136.JPG
An operation kitchen at last.
DSCN0137.JPG
DSCN0138.JPG
Our 1st cooked meal.
DSCN0141.JPG
Our first loaves.
DSCN0150.JPG
Our first NM chile meal.
DSCN0151.JPG
DSCN0153.JPG
Our first flooring experiment was the tower closet.
DSCN0156.JPG
Cottage for sale.
DSCN0157.JPG
Cascade Canyon
DSCN0158.JPG
On a mtn bike for the first time. Going up "Repack."
DSCN0160.JPG
Jamey and Arthur.
DSCN0161.JPG
A fawn hanging out under the redwoods.
DSCN0164.JPG
Up on Mt. Tam's western ridge.
DSCN0165.JPG
Looking over Bolinas.
DSCN0169.JPG
DSCN0171.JPG
DSCN0176.JPG
Leveling the floor.
DSCN0177.JPG
Moisture barrier goes down before the underlayment and the wood.
DSCN0178.JPG
Underlayment.
DSCN0180.JPG
Laying our first boards (living room).
DSCN0183.JPG
Santos mahagony
DSCN0186.JPG
DSCN0188.JPG
Our house looking from the north side of Fairfax. (Center of photo, low on the hillside!)
DSCN0190.JPG
Dining room.
DSCN0191.JPG
DSCN0194.JPG
Maria sorted all of the boards.
DSCN0196.JPG
DSCN0207.JPG
Workspace
DSCN0213.JPG
The kitchen floor is coming together.
DSCN0214.JPG
Hallway behind the stairs.
DSCN0216.JPG
Finally, a dining room with a permanent floor - no cement, no paper. Most of the downstairs flooring is done.