Spring is here - 05/12/06


Today we got the nod from the town inspector to move in. Our electricity was connected, stairs, railings and sewer were approved by the town. The rains stopped about three weeks ago and spring has arrived.

Click on an image to view individually


DSCN0061.JPG
4/20/06. The radiant heat has finally been turned on. A warm house at last.
DSCN0062.JPG
DSCN0065.JPG
Wild iris in bloom on Mt. Tam.
DSCN0067.JPG
DSCN0058.JPG
DSCN0060.JPG
DSCN0077.JPG
DSCN0079.JPG
Greg Giesen putting the final coats on the front door.
DSCN0080.JPG
Fill dirt on the ramp.
DSCN0081.JPG
The architect added a screen wall to store our trash bins behind, and to hide all the surface-mounted devices on the house.
DSCN0083.JPG
DSCN0073.JPG
The tool and the wood for making the stair risers.
DSCN0074.JPG
Sealing the stair risers.
DSCN0075.JPG
DSCN0076.JPG
We have water supplied to our water filter.
DSCN0084.JPG
The first risers going in, and measuring the first tread.
DSCN0085.JPG
The unfinished tread fits nicely!
DSCN0086.JPG
The 1st 5 treads with sealer and polyurethane.
DSCN0087.JPG
DSCN0088.JPG
DSCN0090.JPG
It was too warm in the sun.
DSCN0091.JPG
DSCN0094.JPG
DSCN0095.JPG
DSCN0096.JPG
DSCN0097.JPG
DSCN0102.JPG
5/4/06. Our unofficial 20th anniversary. We finished the stairs, made and installed the handrail, and the front door was installed. We passed electrical inspection so that means we can move in as soon as PG&E can come out to connect us.
DSCN0105.JPG
DSCN0108.JPG
DSCN0099.JPG
DSCN0101.JPG
5/4/06.
DSCN0110.JPG
5/8/06. We made and installed the guard rails.
DSCN0113.JPG
DSCN0116.JPG
DSCN0117.JPG
DSCN0118.JPG
DSCN0120.JPG
John and Jeane helped with the drilling of the rail spacers.
DSCN0121.JPG