| 
    
     
       
     
      
     | 
    
     
       
     
      Our first meal in the dining room. Where's the wine?
     | 
   
   
    
     
       
     
      Ahh!
     | 
    
     
       
     
      The Warm Floors people installed the control system for the radiant heat and connected it to our water heater.
     | 
    
     
       
     
      Working on the front decking between the relentless storm systems.
     | 
   
   
    
     
       
     
      Mostly clear cedar for the front.
     | 
    
     
       
     
      
     | 
    
     
       
     
      The full sun broke through for a minute.
     | 
   
   
    
     
       
     
      Hillside runoff along Forrest Ave. after another week of daily rain.
     | 
    
     
       
     
      The mudslide of  4/12/06 at 220 Forrest Ave. after cleanup.
     | 
    
     
       
     
      220 Forrest Ave after cleanup.  The mudslide came across the road, brought a madrone tree with it,  took out their fence and pushed their truck back a few feet.
     | 
   
   
    
     
       
     
      Cleanup crew the day after the slide.
     | 
    
     
       
     
      The Hillside Dr. mudslide covered up.
     | 
    
     
       
     
      
     | 
   
   
    
     
       
     
      4/14/06. Finally the day has come to finish the decking.
     | 
    
     
       
     
      
     | 
    
     
       
     
      Tony, Alfonso and Mauro putting the last trim on the front decking.
     | 
   
   
    
     
       
     
      
     | 
    
     
       
     
      4/15/06. The front decking is finished. We parked on our driveway for the first time.
     | 
    
     
       
     
      04/15/06
     |