Our first lunch in the kitchen.
|
Mike and Drake delivering the water heater.
|
Sliding down the hill out of control!
|
They regained control.
|
3/8/06. The scaffolding is being removed.
|
Poles for the decking.
|
|
3/10/06. That's snow in San Francisco!
|
3/12/06. Standing on the new deck for the first time.
|
|
The interior is painted.
|
|
|
Adam installing the first lighting track.
|
|
3/13/06. The scaffolding is gone.
|
3/15/06. Enough of a break in the weather to pour the 1st half of the driveway.
|
|
|
The electricians.
|
Music room tracks.
|
|
|
Broom finish for the driveway cement.
|
|
Found a rug on Craigslist for the music room.
|
Drake connecting the water heater.
|
Add refridgerator, range hood and pendant light.
|
|
Another break in the weather and the rest of the driveway was finally poured. Most work has been done under less-than-ideal weather condtions.
|
Greg fitting a backsplash for the tub.
|
Carlos finishing the stone (rojo alicante) in the downstairs bathroom.
|
Henry Moore-ish bathroom faucet.
|
Installing stone thresholds in the entry.
|
|
Downstairs bathroom floor going in.
|
|
Tub gets backsplashes.
|
Kitchen fixtures.
|
|
We brought the washer and dryer in a downpour.
|
|
We insulated under the stairs a few days before the treads and risers are installed.
|
|
Treads and risers for the stairs.
|
Rear deck is completed except for a piece of trim.
|
|
|
|
Fill from the sewer excavation.
|
Finally a gas meter.
|
The sewer hookup under the road.
|
|
3/31/06. Front deck posts are up.
|