A break in the weather. The exterior painters got started and we have a new layer of plywood on the parking deck so we can waterproof it.
|
Primer coat.
|
Antonio and Jamie.
|
New plywood and flashing on the driveway - ready to be waterproofed.
|
The house is almost painted!
|
The last pieces of siding go up now that the deck flashing is in place.
|
|
|
|
Abel installing an access door to our soaking tub plumbing, the tub will be enclosed in marble.
|
First coat of paint is on.
|
Maria with John Barone - probably one of the few people around who would tackle our foundation project.
|
PG&E finally arrived to connect our gas. Mark is cool.
|
4'under the pavement is the gas main. The .5" yellow line is our gas connection.
|
Les was the other half of the PG&E duo.
|
Voila! Gas line and pressure valve connected and painted.
|
John Barone did the trenching of the street. PG&E had the easy part.
|
The driveway crew at lunch. They prepared the forms and laid the rebar for pouring the driveway.
|
|
|
Bert painted the tower.
|
Rob at Marin Lumber supplied our doors, door hardware and cabinet pulls.
|
Our marble arrives!
|
|
|
Salvi and Alfonso installing the bathroom counter.
|
Greg measured for our stone and is in charge of the installation.
|
|
|
|
|
The first pieces for the tower.
|
|
|
|
|
|
|
|
|
The decking posts arrived.
|
|
As of 02/25/06.
|