Paint and stone - 02/25/06


The exterior is painted. The interior is primed and the some of the finish coats applied. The stone fabricators, Creative Stoneworks, have almost completed the installation of our marble. The kitchen and bathroom countertops are finished. Thanks to Keith Hembree and his crew at Creative Stoneworks: the details of the stone work are meticulous. Billie Jo Mouren of Coastline Cabinets guided us through the process of choosing our cabinets and she ordered them for us. We'd still be trying to figure it all out if not for her. Keith and Billie Jo are the best.

Click on an image to view individually


P2060001
A break in the weather. The exterior painters got started and we have a new layer of plywood on the parking deck so we can waterproof it.
P2060002
Primer coat.
P2060003
Antonio and Jamie.
P2060005
New plywood and flashing on the driveway - ready to be waterproofed.
P2100010
The house is almost painted!
P2100020
The last pieces of siding go up now that the deck flashing is in place.
P2130001
P2130004
P2130005
P2150006
Abel installing an access door to our soaking tub plumbing, the tub will be enclosed in marble.
P2150007
First coat of paint is on.
P2240001
Maria with John Barone - probably one of the few people around who would tackle our foundation project.
P2220001
PG&E finally arrived to connect our gas. Mark is cool.
P2220002
4'under the pavement is the gas main. The .5" yellow line is our gas connection.
P2220003
Les was the other half of the PG&E duo.
P2220004
Voila! Gas line and pressure valve connected and painted.
P2220005
John Barone did the trenching of the street. PG&E had the easy part.
P2220006
The driveway crew at lunch. They prepared the forms and laid the rebar for pouring the driveway.
P2220007
P2220008
P2230004
Bert painted the tower.
P2240021
Rob at Marin Lumber supplied our doors, door hardware and cabinet pulls.
P2230001
Our marble arrives!
P2230002
P2230003
P2230005
Salvi and Alfonso installing the bathroom counter.
P2230006
Greg measured for our stone and is in charge of the installation.
P2230007
P2240002
P2240004
P2240006
P2240019
The first pieces for the tower.
P2240010
P2240012
P2240013
P2240014
P2240015
P2240016
P2240017
P2240018
P2250004
The decking posts arrived.
P2250005
P2250001
As of 02/25/06.