More details - 12/14/05


The tiebacks passed the stress tests, which signaled the go-ahead for the driveway and roof. The driveway is backfilled and ready to be poured. The access ramp soil was used to fill the driveway, so the front "yard" has taken its shape. The scaffolding is up for the windows, siding and painting, and the roof is scheduled for 12/16/05.

Click on an image to view individually


PC140001
12/14/05. The driveway bed is ready so there's finally direct access to the house from the street. Hallelujah. The facia are going up.
PC140002
The future shape of the land. The slope in the foreground is part of our front yard. The form at the upper end is for the driveway curb.
PC140004
PC140005
The gas line is laid.
PC140006
Alfonso on the roof, installing ceiling vents.
PC140007
The roof.
PC140009
PC140010
View from the roof. Miguel covering the gas line.
PC140011
PC140012
BTW, those are thingies of tar on the driveway. We'll have a roof in two days.
PC140014
The kitchen window goes in.
PC140018
Kitchen window.
PC140020
PC140016
The tiebacks are now secured, having passed the stress tests.
PC140003_1
PC140017
Tony and Alfonso installing the ceiling vents.
PC140001_1
The trench and the beginning of the sewage line coming up to the street, where it will tie into the county sewer.
PC140003
Scaffolding will be up by the end of the day. This means the windows and the rest of the siding can be installed.
BJM Drawing
Our cabinet designer/consultant Billie Jo drew our kitchen cabinets.