12/14/05. The driveway bed is ready so there's finally direct access to the house from the street. Hallelujah. The facia are going up.
|
The future shape of the land. The slope in the foreground is part of our front yard. The form at the upper end is for the driveway curb.
|
|
The gas line is laid.
|
Alfonso on the roof, installing ceiling vents.
|
The roof.
|
|
View from the roof. Miguel covering the gas line.
|
|
BTW, those are thingies of tar on the driveway. We'll have a roof in two days.
|
The kitchen window goes in.
|
Kitchen window.
|
|
The tiebacks are now secured, having passed the stress tests.
|
|
Tony and Alfonso installing the ceiling vents.
|
The trench and the beginning of the sewage line coming up to the street, where it will tie into the county sewer.
|
Scaffolding will be up by the end of the day. This means the windows and the rest of the siding can be installed.
|
Our cabinet designer/consultant Billie Jo drew our kitchen cabinets.
|