Pouring the foundation - 09/15/05


The lower two-thirds of the foundation have been completed. The retaining walls for the parking deck and the parking deck itself remain to be poured. While some of the crew are doing that, others will start framing the walls on the lower sections.

Click on an image to view individually


Forrest_050915_01
The lower foundation, over which will be the living area of the house has been poured. They've begun forming the footings which will be under the entry porch and parking deck.
Forrest_050915_02
Preparing the next pouring project.
Forrest_050915_03
The poured piers for the retaining wall at the lower left corner of the lot. You can see from the steepness of the bank that it has come off in chunks. We're required to try to shore up any further erosion. The piers are around 6 ft. tall.
Forrest_050915_04
The big wall poured with access holes to drill and install the tiebacks.
Forrest_050915_05
The rear foundation wall of the house.
Forrest_050915_06
This tie beam had to be moved/re-formed to the opposite diagonal the next day to give us room for another bedroom if we want it.
Forrest_050915_07
View from under the eventual deck
Forrest_050915_08
Forrest_050915_09
Form for a tie beam in the lower storage area.
Forrest_050915_10
The grade beam running down the center.
Forrest_050915_11
Under the parking deck.
Forrest_050915_12
Reference view from the neighbor's driveway.
Forrest_050915_13
The upper grade beams are almost ready to be poured.
Forrest_050915_14
The lot as of 9/13/05.
Forrest_050915_15
A few days later they poured the upper grade beams. The wooden forms are removed.
Forrest_050915_16
The tie beam poured.
Forrest_050915_17
Lower storage area. The near tie beam is now at the opposite corners of the space from the earlier picture.
Forrest_050915_18
View from below of Henry's fortress!
Forrest_050915_19
Forrest_050915_20
Maybe we should just have an outdoor performance area.
Forrest_050915_21
The second concrete pouring is completed. The upper retaining walls and the parking deck remain to be done, along with a considerable amount of excavation.
Forrest_050915_22
Reference view from the neighbor's driveway.
Forrest_050915_23
As of 9/15/05.