<- Forrest Home Page

New profile - 11/09/05

Page 1  |  Page 2

These photos cover three weeks of construction. It will be another month from this point before the driveway can be poured, and subsequently, the roofing done, since the roofer needs the driveway. The tiebacks have been set in grout and they need 4 weeks to cure before stress testing. The driveway can't happen until the tiebacks are tested. (There are two pages of photos.)

Click on an image to view individually


PA190001
10/19/05. Arrived to deliver our first plumbing fixture. This 22' x 8.25" x 18.5" beam was about to be lowered onto the framing over the ping pong room by the crane in the background. The car deck will rest on it.
PA190002
First real clouds in a long while. The retaining wall is done.
PA190004
Lowering the driveway beam.
PA190005
PA190006
PA190007
PA190008
Touchdown!
PA190009
PA190010
We finally got Marshall to take some credit for his fine work. That beam fits precisely on its wall supports which are some 22' apart.
PA190012
Sitting in the living room already.
PA190013
The floor of the ping pong room and the stairs leading to it from the living room.
PA190015
PA190016
The stairwell between floors.
PA190017
PA190018
PA270001
10/27/05. Lunchtime. We brought burritos and this time the architects want in on the our local taqueria fare - more mouths to feed!
PA270002
The plank from the street to the parking deck. Everything has had to be carried across the plank from the street, since there is no driveway, and there won't be for another month.
PA270005
Front porch and stairs taking shape.
PA270007
Mary and Art (one of the architects).
PA270008
PA270009
PA270012
PA270013
PA270014
PA270015
Mary with Art Chartock and Bryan Murdock of of Rushton- Chartock Architects.
PA300001
10/30/05
PA300002
PA300003
PA300004
Our steep front yard.
PA300005
Standing in the tower for the first time.